• Mr. Richard Penn

BLACK TUSK STARTS DRILLING AT GOLDEN VALLEY

Mr. Richard Penn reports

BLACK TUSK RESOURCES INC. COMMENCES DIAMOND DRILLING ON THE GOLDEN VALLEY PROJECT, QUEBEC


Diamond drilling is now under way on Black Tusk Resources Inc.'s Golden Valley project in the Abitibi greenstone belt. A total of 15 sites have been selected for drilling, with several targets delineated from historic drilling. Initial drilling will verify and expand upon the more positive results returned from historic exploration. Continued drilling will follow mineralized structures mapped by the initial drill holes. The structures include potential shear-hosted gold mineralization and potential multielement iron formation mineralization as logged during historic drilling programs.


Black Tusk personnel will be on site, overseeing the drilling program. A local Quebec-based consulting group has been contracted to undertake core logging and core sampling at Black Tusk Resources core shack, located in Villebois, approximately 25 kilometres south of the Golden Valley property.


The Golden Valley project is located 26 kilometres south of Hecla Mining Corp.'s Casa Berardi mine, currently in production, and lies within the Abitibi greenstone belt that is host to many world-class mineral deposits.


The property is easily accessible via an existing major road utilized for logging and mining.


"We are extremely excited to be on the ground here with our exploration team and it has been very pleasing to see the current scale of our operation under way," stated Black Tusk chief executive officer Richard Penn.


We seek Safe Harbor.

26 views0 comments

Recent Posts

See All

BLACK TUSK CORRECTS CEO SHAREHOLDING TO 505,075 SHARES

Mr. Richard Penn reports BLACK TUSK CORRECTS SHAREHOLDINGS IN INFORMATION CIRCULAR Black Tusk Resources Inc. has provided this news release to correct information provided in the information circular

BLACK TUSK COMPLETES DRILLING PROGRAM AT LORRAIN

Mr. Richard Penn reports BLACK TUSK COMPLETES DIAMOND DRILLING ON LORRAIN PROPERTY, QUEBEC & ANNOUNCES CORPORATE CHANGES Black Tusk Resources Inc. has completed diamond drilling on its Lorrain propert

BLACK TUSK DRILLS 1 M OF 1.185 G/T AU AT MCKENZIE EAST

Mr. Richard Penn reports BLACK TUSK RESOURCES INC. COMPLETES DIAMOND DRILLING ON THE MCKENZIE EAST GOLD PROJECT, VAL-D'OR, QUEBEC Black Tusk Resources Inc. has released the results from the first four